Saturday, July 31, 2010

Walking trail - weekend one

The fountain is working great and doing its job!!

Discussion of the next task at hand for the walking trail.


George Oaks operates a mini excavator along the walking trail.

Prep work needed to build the walking trail around the pond requires the landscaping cloth to be removed from the entire perimeter of the pond. Luckily, we had some heavier equipment (besides our hands) to handle the job.


Albert Smith empties some of the landscaping cloth into the dump truck after its removal.

1 comment:

  1. This is an awesome, worthwhile project - good luck to you and your efforts!!