Saturday, July 31, 2010

Walking Trail - Weekend Two...

The following pictures show the trail that is being built around the perimeter of the pond. It is almost unbelievable the work that has been achieved over the past two weekends.


Before:

After:




The following pictures show some of the equipment and manpower behind the walking trail. For the few, dedicated volunteers that came to help out, the project progressed more than expected.






Walking trail - weekend one

The fountain is working great and doing its job!!

Discussion of the next task at hand for the walking trail.


George Oaks operates a mini excavator along the walking trail.

Prep work needed to build the walking trail around the pond requires the landscaping cloth to be removed from the entire perimeter of the pond. Luckily, we had some heavier equipment (besides our hands) to handle the job.


Albert Smith empties some of the landscaping cloth into the dump truck after its removal.